Project Name:
South Pars Phases 9 and 10 Pipelines

Year:
2006

Scop of work:
The two pipeline systems comprised a total of 173km of 32” diameter API 5LX 65 Concrete coated pipe, with a 4” diameter API 5 LX 52 Piggy back line.

Project Information:
These lines were laid by C-Master from Assoluyeh beach site out to their respective field locations adjacent to the SPD 10 and SPD 11 platforms during the winter season of 2006/2007.  The production rate peaked at 177 joints per day during the Phase 10 installation with an overall weld repair rate of less than 2% for the entire project.


Project Name:
South Pars Phases 17 and 18 Shore Pulling

Year:
2007

Scop of work:
Mainline O.D.32", W.T.20.6mm, & Piggy backline O.D.4", W.T.6.4mm,  Total Pipeline Length 8.4Km
Project Name:
Salman Field, Sirri-Assaluyeh Pipeline

Year:
2008

Scop of work:
Mainline O.D.32", W.T.20.6mm, Total Pipeline Length 288Km

Project Information:
Offshore Pipe laying-S Lay and Shore Pulling, Best Record of 189 Joint/Day



Project Name:
South Pars, Phases 15 and 16

Year:
2009

Scop of work:
Mainline O.D.32"-W.T.20.6mm, Piggy backline O.D.4.5"-W.T.6.4mm, Total Pipeline Length 108.82Km (SPD21), 112.71Km (SPD22)

Project Information:
This work was commenced in October 2009 and continued until late November when the work was put on hold by the client. The project is scheduled to recommence in the middle of 2011.

Project Name:
Reshadat

Year:
2011

Scop of work:
56 km of 10" export pipe line

Project Name:
South Pars Field, Phases 17 & 18

Year:
2012

Scop of work:
207 km 32" pipeline with 4" piggy back

Project Information:
This work will be a continuation of the beach approach work, carried out in June 2007, whereby Kito installed the first 4.2 km of each pipeline at Assoluyeh beach approach site. The timing for continuation of SP 17 & 18 is yet to be determined.




Project Name:
South Pars Field, Phase 12 (A, B & C)

Year:
2010

Scop of work:
Mainline O.D.32", W.T.20.6mm, O.D. 30", W.T. 15.9mm, Piggy backline O.D.4.5"-W.T.6.4mm, 7.96km (Shore Pulling) & 47.91km (Pipelaying) from the Total Pipeline Length of 438.25Km

Project Information:
The South Pars Phase 12 project was split into Phases A, B and C, and consists of three 32” dia pipelines, with 4” piggy back pipelines running from Tombuk beach site to the respective SP 12 offshore platform locations, as well as a 30” dia tanker loading line .

Total length of export pipelines is approximately 439km of production lines, plus 4.2 km of 30” loading line to the future tanker loading system.

The best production rate to date has been 200 joints per day on the 32”/4” SP 12A pipeline.
Project Name:
South Pars Field, Phase 15

Year:
2011

Scop of work:
Mainline O.D.32"-W.T.20.6mm, Piggy backline O.D.4.5"-W.T.6.4mm, Total Pipeline Length 108.82Km (SPD21), 112.71Km (SPD22)

Project Information:
Shore Pulling and Pipelaying

Project Name:
Reshadat, Ilam, Salman, Abouzar & Nowrooz

Year:
2011

Scop of work:
5.17 km 8", 5.41 km 10", 5.26 km 16" pipe Reshadat field; 3 km 14" - Ilam field, 5.4 km 8" & 4.72 km 10" - Salman field; 4.16 km 16" - Abouzar field; 2.88 km 10" - Nowrooz field

Project Information:
8 well fluid and water injection pipelines

Project Name:
Foroozan

Year:
2011

Scop of work:
63 km total; 3 x 4", 1 x 6", 2 x 8", 1 x 18", 13 km 24" export line
Project Name:
South Pars Field, Phases 19

Year:
2013

Scop of work:
230 km 32" pipeline with 4" piggy back including 5.7 Km of 36".
Project Name:
South Pars Field, Phase 12 (A)

Year:
2010

Scop of work:
Mainline O.D.32", W.T.20.6mm, O.D. 30", W.T. 15.9mm, Piggy backline O.D.4.5"-W.T.6.4mm, 7.96km (Shore Pulling) & 47.91km (Pipelaying) from the Total Pipeline Length of 438.25Km

Project Information:
Shore Pulling (1.2km-12A, 2.80km-12B, 2.90-12C & 3.6-30"), Pipelaying (43.74km-12A, 4.17km-30"), Total 48Km laid till now
Project Name:
Lazarevskoje - Dzhugba-Sochi pipeline

Year:
2010

Scop of work:
O.D.20" 143.7Km & O.D. 6" 0.5Km

Project Information:
Construction works were carried on the 159.5-km 20” offshore section gas pipeline, which runs parallel to and about 4.5 kilometers from shore, to the Kudepsta gas distribution station near Sochi.  The pipe line will have capacity to ship about 3.8 billion cubic meters a year.  Progress with the C Master was consistent and steady under difficult conditions with lay rates exceeding 200 joints per day. The offshore section was completed in June 2010.

Project Name:
SP 22&23 Shorepull and Pipelaying

Year:
2014

Scop of work:
110.4 + 1.1 km 23"&4" pipeline

Project Name:
SP 20/21 Pipelaying

Year:
2015

Scop of work:
95.35km + 102.7 km

Project Name:
SPD 14 Shore Pulling

Year:
2015

Scop of work:
32" and 4" piggy back


Project Name:
Foroozan Rectification Project

Year:
2013

Scop of work:

Project Name:
Soroosh Infield

Year:
2014

Scop of work:
5.86+5.78 km 16" Pipeline

Project Name:
Hengam 14"/ 4" Pipeline

Year:
2014

Scop of work:
2.13+1.36 km  14" Pipeline

Project Name:
SP19 - CRA

Year:
2014

Scop of work:
5.27km + 8.05km = 13.32 km 18"

Project Name:
Ilam Abouzar

Year:
2016

Scop of work:
24" Infield and 18" Infield